Generation Feasibility Study

April 7, 2010 by admin

In 2008 Essex performed a reconnaissance level condition assessment on several of Green Mountain Power’s (GMP) existing generation facilities along with a screening study of new generation alternatives. The screening study included:

  • Preparation of general arrangement drawings;
  • Development cost estimates (using site specific and vendor data);
  • An initial assessment of fuel options;
  • Electrical interconnection requirements;
  • Preliminary assessment of the permitting effort and associated risks;
  • Budgetary estimates of CapEx and OpEx, and;
  • Performing preliminary financial analyses.

Results of the screening study identified several viable alternatives. Essex is assisting GMP with more detailed studies on the most attractive options.



No Comments

No comments yet.

RSS feed for comments on this post. TrackBack URL

Sorry, the comment form is closed at this time.

  • About The Essex Partnership

    Tule Marsh

    Strategic energy and environmental planning.

    Working with diverse stakeholders in collaborative environments to forge lasting agreements.

    The Essex Partnership focuses on helping decision makers capitalize on emerging opportunities while maintaining high standards of environmental stewardship and social responsibility.